The switching element with time delay is used to cut off the power supply to the circuits of machines or installations, gradually with ramp-down time, with rated currents up to 20A.
The HST-ME1 built-in switching element with time delay is used to cut off the power supply to the circuits of machines or installations, gradually with ramp-down time, with rated currents up to 20A.
The HST-ME2 built-in switching element with time delay is used to cut off the power supply to the circuits of machines or installations, gradually with ramp-down time, with rated currents up to 20A.
The HST-MA1 built-on switching element with time delay is used to cut off the power supply to the circuits of machines or installations, gradually with ramp-down time, with rated currents up to 20A.